COOPER Drilling Rigs - Well Service | Workover Rigs

Details

General Specs

COOPER 550 Well Service | Workover Rigs

Well Service | Workover Rigs

Good

COOPER 550

Frisco TX USA


General Specs

2015

550

104 ft

250,000 lb


Detailed Description

Workover Rigs - Cooper 550 Workover Rig - Complete - purchased 2015, 550HP, 104ft  250,000# mast

Rig:  SP550DD-A workover rig, 550 HP, double drum, 83A 150 Ton tubing block
Mud Pump:  EWS440-5K mud pump powered by Detroit Series 60 engine, Allison 750HT Transmission, suction and discharge manifold
Tubing Tong:  Gill model 500 tubing tong c/w air backup, hydraulic lift cylinder, 2 -3/8” and 2-  7/8” Jaws & Inserts
Extension:  Lift Hanger Extension (dummy lift) L-521
Stiff Arm:  Long Foster Stiff Arm A511-A
BOP:  7- 1/16”, 5000# dual hydraulic BOP complete with CSO, 2-3/8” and 2-7/8” ram blocks, IE7-5MD-R
Stripper Head: Tall Hall Stripper Head
Elevator Links:  1-3/4” x 96” 150 Ton King “Big Eye” Elevator Links – EB175-96BI
Weight Indicator:  240,000# Pennant Style Pad Type Weight Indicator w/10” Pads
Counterweight:  Derrick Counterweight Assembly, Bucket, Climbing Line, Swivel Block w/Clevis DCA-1000
Lifeline:  DBI Sala Retractable Lifeline – 130’ (3403600)
Bolts:  Combination Bolts 1500-900 (6-1/4” Overall Length), 1-3/8” Stud Bolt w/nut
Derrick Belt:  DBI/SALA Derrick Belt-Medium
Trailer:  2015 Parker 7ft Wide Tandem Dog House Trailer, 2- Rock Heater Installed
Gas Buster:  Tank with Gas Buster
Weight Indicator:  Clipper Style Weight Indicator – Rebuilt
Trailer:  20’ Tandem Axle Trailer
Rod Tong:  Carter Rod Tong
Misc:  Base Beam, Rod Elevators, Clipper Style Weight Indicator, 2-3/8” & 2-7/8” Tubing elevators, Tubing spider, Tools
Ram Block Assy:  7-1/16” x 4-1/2” 5M Townsend Type 81 Ram Block Assy. w/rubbers
Back