86.5 MW Power Equipment - Generators | Electric Power

  • Generators | Electric Power
  • New
  • 86.5 MW GENERATORS
  • 10440
  • Edmonton , AB CAN
I accept the Tradequip International terms of use & service:   


Stay safe. Read more about avoiding scams and protecting your money. By using this site, you agree to our Terms of Use & our Privacy Policy.


  • Generators | Electric Power
  • New
  • 86.5 MW GENERATORS
  • 10440
  • Edmonton , AB CAN

Iron Hub

  • 30th Floor

    421 7 Ave SW

    Calgary, AB T2P 4K9 CAN

    Map It
  • 1-833-476-6482
  • (587) 783-8393
  • Auction Details

    General Specs

    New

    Detailed Description

    Generators | Electric Power - 86.5 MW GE (General Electric) 7E.03 Gas Turbine Generator Package Year: 2014; Housed: No; Skidded: No; PASC Condition Rating: A; Condition Details: Never Used. Factory test fire only; Units Available: 1; Connection Status: Disconnected; Warranty: No; Warranty Details: Exp Dec 2018; Generator Make: GE (General Electric); Generator Model: 7A6; Generator Serial #: 436X273; Electric Capacity: 86.5 MW; Electric Capacity(Unit of Measure): MW; Electric Capacity(Use selected Unit of Measure as display unit): true; Hertz: 60 Hz; Driver Types: Gas Turbine; Driver Make: GE (General Electric); Driver Model: 7E.03; Driver Serial #: 299258; Max HP: 122,000 hp; Rated RPM: 3600 RPM; Overall Weight(Unit of Measure): weight-kg; Building Heated: No; Notes: The package comprises the following major components along with all GE scope of supply and auxiliaries:	Frame 7EA Gas Turbine model PG7001EA (7E.03)	Dry Low NOx (for DLN 1.0 Combustion System*)	Natural gas single fuel supply	Design Site Output/Heat Rate 84.6MW at 1916 ft and 32°F; 91MW at 0 ft and 32°F	Includes GE PIP package (minus Stg 3 Aero), 2055°F firing temp	Inlet/Exhaust: Pressure drop: 3.5/5.5 inches of H2O	Hours: factory test fire only, i.e. New	Control System: MKVIe Speedtronic TMR	Generator: GE/Andritz	Frame: BDAX (Brushless)	Excitation: GE EX2100	Frequency/Power Factor: 60 Hz/0.85 pf	Rated Output: 101.8 MVA	Cooling: Air-cooled	Designed for the Canadian Market	Stored in accordance with GE's storage/preservation requirements*Combustion system not included or installed.Other Auxiliary Equipment (not included in GTG package and subject to availability):	Air Cooled Glycol Heat Exchangers c/w VFD’s, Glycol Pumps, Glycol Expansion Vessel, 52G synchronizing breaker compartment included @ 13.8KV incl. all protection relays etc. - Terminal Voltage: 13.8Kv (2 pole, 3-phase, Wye conn.)No diverter stack component available; Internal Comments: ASKING PRICE: $25,000,000 CAD Replacement value: $30,000,000 USD (~$40,000,000 CAD) MEG paid $29,114,503.43 Maintenance / Support Info GE provides craft support for maintenance through the GE owned organization Fieldcore. Technical support and new parts and repairs are available direct from GE. https://www.fieldcore.com/ My GE account manager is Mia Clark - Clark, Mia (GE Power) mia.clark@ge.com. 780 983 7067 She can put people in touch with whomever they need within GE. Most of the folks directly involved in the sale of this turbine to MEG Energy have changed roles at this point. You can also let people know there are substantial capabilities to support 7EAs from parts, technical support, and craft perspectives outside of GE. Some of the parties who would probably look at selling warranty and term service agreements would be: Ethos Energy PSM Ansaldo Doosan Sulzer MD&A NRG Energy TRS Global ServicesBuyer will need to engage GE or others if buying additional items.  Cost to set up and commission can be aided by GE or others.Electrical substation and associated switches are not included in GE Scope of Supply’ but may be sold separately.; Joint Venture: No;
     Report this listing